GMK 3D Metal Tibial Tray 02.12.3D34RRecalls & reported problems
Medacta International SA · 3DMetal Tibial Tray Size T3I4R · Class 2 · Implant
Data updated Oct 18, 2026 from official FDA records · Editorial policy
- Adverse event reports
- 3
- Deaths reported
- 1
- Injuries reported
- 1
- Recalls naming it
- 0
Summary
The FDA's MAUDE database contains 3 adverse event reports that list this exact device (DI 07630345710901), received between Aug 6, 2025 and Mar 30, 2026 — classified as 1 death, 1 injury, 1 malfunction.
The most frequently reported specific device problem is “Malposition of Device” (1 report).
Reports come from manufacturers, hospitals and patients and are not verified by the FDA. A report does not prove the device caused the event, and counts can't be used to compare devices or estimate failure rates. What reports can and can't tell you · How this data works · Data updated Oct 18, 2026.
Reports received per month
Most reported problems
Device problems
- Adverse Event Without Identified Device or Use Problem1
- Malposition of Device1
- Migration1
Patient problems
- Bone Fracture(s)1
- Joint Laxity1
- Loss of Range of Motion1
- Pulmonary Embolism1
Recent adverse event reports
The 3 most recent of 3 reports, in the reporter's own words as published by the FDA.
MalfunctionMar 30, 2026Malposition of Device
IMPLANT MALALIGNMENT WAS IDENTIFIED SIX WEEKS AFTER THE PRIMARY SURGERY. APPROXIMATELY 8° OF VARUS ALIGNMENT OF THE TIBIAL COMPONENT AND 10° OF VALGUS ALIGNMENT OF THE FEMORAL COMPONENT WAS IDENTIFIED. THE PATIENT REPORTS A FLEXION CONTRACTURE. AT THIS TIME, NO REVISION PROCEDURE IS PLANNED. THE PRIMARY WAS PERFORMED USING MYKNEE GUIDES AND NEXTAR. NO INTRA-OPERATIVE OR IMMEDIATE POST-OPERATIVE ISSUES WERE REPORTED.
Patient problems: Loss of Range of Motion
MAUDE report 24710790 ↗DeathJan 19, 2026Adverse Event Without Identified Device or Use Problem
ON (B)(6) 2025, PRIMARY KNEE SURGERY WAS PERFORMED AND COMPLETED WITHOUT COMPLICATIONS. BONE QUALITY WAS SUBOPTIMAL. ON (B)(6) 2026, THE PATIENT PRESENTED WITH PAIN DUE TO A BONE FRACTURE LEADING TO DISPLACEMENT OF THE TIBIAL TRAY. ALL COMPONENTS WERE REVISED USING A CEMENTED ZIMMER LCCK SYSTEM. THE PATIENT DID NOT REPORT ANY TRAUMATIC EVENT AS THE CAUSE. THE PATIENT PASSED AWAY AROUND (B)(6) 2026, DUE TO A BILATERAL CENTRAL PULMONARY EMBOLISM OCCURRING WHILE ON LOVENOX 60 MG OR DURING THE TRANSITION TO ELIQUIS 5 MG TWICE DAILY.
Patient problems: Bone Fracture(s); Pulmonary Embolism
MAUDE report 24108996 ↗InjuryAug 6, 2025Migration; Migration
FOURTEEN (14) DAYS AFTER THE PRIMARY SURGERY, THE PATIENT REPORTED INSTABILITY AND DISCOMFORT, WITH AN UNKNOWN CAUSE. THE SURGEON FOUND THE TIBIA TO BE SOFT AND COLLAPSED DUE TO OSTEOPENIC BONE. A TIBIAL REVISION WAS PERFORMED, AND THE INSERT WAS UPSIZED FROM 11MM TO 14MM TO ADDRESS THE INSTABILITY. THE SURGERY WAS SUCCESSFUL.
Patient problems: Joint Laxity
MAUDE report 22727958 ↗
Other Prosthesis, Knee, Patellofemorotibial, Semi-Constrained, Cemented, Polymer/Metal/Polymer devices
- ATTUNE 1506-00-005Depuy (Ireland) · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER589 reports
- ATTUNE 1506-00-004Depuy (Ireland) · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER580 reports
- JOURNEY 74012812Smith & Nephew, Inc. · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER502 reports
- JOURNEY 74011856Smith & Nephew, Inc. · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER438 reports
- PERSONA™ 42-5099-094-00Zimmer, Inc. · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER406 reports
- JOURNEY 74011857Smith & Nephew, Inc. · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER388 reports
- ATTUNE 1506-00-007Depuy (Ireland) · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER288 reports
- ATTUNE 1506-00-003Depuy (Ireland) · PROSTHESIS, KNEE, PATELLOFEMOROTIBIAL, SEMI-CONSTRAINED, CEMENTED, POLYMER/METAL/POLYMER271 reports
Sources and updates
- Device record: FDA GUDID, file dated Oct 13, 2026 · View this device in AccessGUDID ↗
- Adverse event reports: FDA MAUDE, file dated Oct 14, 2026 · each report above links to its original FDA record
- Recalls: FDA Medical Device Recalls, file dated Oct 16, 2026
- Page last rebuilt: Oct 18, 2026. Data downloaded through openFDA, which notes it is not validated for clinical or regulatory use.
How reports and recalls are matched · Editorial policy · Report an error on this page